Adding to what Mr. Redwine said, the structural firm I work for runs the Tally Model for the structural system. This is to eliminate any confusion or under/over-conservative assumptions as not all structural materials are adequately represented in Tally, namely with regards to concrete and CMU systems. The discussion of including a Tally LCA Run happens early so the appropriate fees and timelines can be discussed.